Munimentx Early access

The offline CSMS tool for UN R155 + ISO/SAE 21434 Clause 5.

A self-contained offline CSMS tool for Windows that turns ISO/SAE 21434 Clause 5 and UN R155 — with EU Cyber Resilience Act (CRA) mapping — into a living, audit-ready system of record — governance, work products, evidence and a one-click audit binder — without a cloud platform or a consulting engagement.

Your compliance data never leaves your machine. No cloud. No telemetry. No subscription. Early access — capabilities on this page may evolve before general availability.

Munimentx compliance dashboard — overall readiness, per-framework coverage and a ranked gap list

The problem

Every programme must operate a CSMS — and prove it on demand.

UN R155 and ISO/SAE 21434 Clause 5 require a working Cybersecurity Management System — policy, roles, managed processes, risk and supplier oversight, monitoring, incident handling, and a complete, traceable evidence trail. Today teams are stuck between three bad options:

Enterprise cloud GRC / vSOC

Capable, but priced for large OEMs — and they put your governance data and IP in someone else's cloud.

Spreadsheets & shared drives

Not built for 21434/R155 — coverage status is invisible, evidence is scattered, and every audit is a fire drill.

Consultants

Expensive — and the knowledge (and the living system) walks out the door when the engagement ends.

Meanwhile Tier-N suppliers, smaller OEMs and teams on air-gapped networks must produce the same audit-ready CSMS evidence — on a realistic budget, without sending their IP to the cloud. That gap is exactly where Munimentx sits.

Headstart — blurred preview

Preview blurred to protect proprietary detail — book a demo to see it live.

What Munimentx is

The organisational cybersecurity lifecycle — as a guided desktop workbench.

A single-user Windows desktop application that implements the organisational CSMS as a guided workbench and produces the auditor-ready deliverables at the end. It runs 100% offline and stores everything locally in a project file you own.

  • Covers ISO/SAE 21434 Clause 5 (plus touch-points in 6/7/8/15) and UN R155 (CSMS).
  • Speaks UN R156, the EU Cyber Resilience Act, and ISO/DIS 24882 — switchable per organisation.
  • 100% offline — works on a machine that has never touched the internet.
  • Headstart seeds an editable starter library of controls, roles and a policy outline, pre-mapped to the clauses you select.

Capabilities

From governance to a hand-over binder — the heavy lifting, automated

Live readiness across frameworks

A real compliance-readiness score computed from your actual work products — per-clause, per-framework and overall — with complete / partial / missing coverage bars and a ranked gap list that deep-links to the work product resolving each clause.

The compliance spine

A register of Controls, Processes, Tools (with qualification confidence) and Competence — each mapped to the clauses it satisfies and backed by evidence. Plus Projects (Clause 6) and Suppliers (Clause 7 + R155 §7.2.2.5) with a dynamic RASIC split.

Governance & approval gating

A cybersecurity policy + objectives editor and a RASIC roles register. The operational areas unlock only once an approved policy and at least one approved role are in place — enforcing genuine segregation of duties.

Continual cybersecurity

An organisational cyber-risk register, monitoring sources & events, vulnerability management and incident handling — each feeding the live needs-attention signals so nothing falls through the cracks.

Audits & CAPA

Record internal/external audits and their findings, raise corrective actions with an owner, due date and status, track overdue items, and verify a CAPA — which auto-closes its finding and attaches the closure evidence.

Evidence vault & one-click binder

Attach evidence as files (copied into a project vault, SHA-256 hashed and re-verified on load) or notes. Export the Evidence Binder to Word and Excel in one click — approved registers, full logs and a clause-by-clause compliance matrix.

Baseline snapshots — see your drift

Capture a point-in-time baseline (e.g., a type-approval submission) and diff against it later to see exactly what changed: regressions, newly-covered or de-scoped clauses, and framework-scope changes.

Offline AI assistant

An on-device model (IBM Granite, Apache-2.0) drafts policy statements, CAPA actions, vulnerability analyses and rationale — every suggestion enters as an editable draft for the engineer to approve. No cloud, no data egress.

Inside Munimentx

See the system at work

Screens from the workbench — previews are intentionally blurred to protect proprietary detail. Book a demo to see them in full.

Governance — policy, objectives and the RASIC roles register with approval state (blurred preview)

Governance — policy, objectives & RASIC roles

The compliance spine — controls mapped to framework clauses, backed by evidence (blurred preview)

The spine — controls mapped to framework clauses

Control editor — clause mapping and supporting evidence in one place (blurred preview)

Control editor — clause mapping & evidence

Organisational cyber-risk register — inherent vs residual risk, treatment and status (blurred preview)

Risk register — inherent vs residual, treatment & status

Audits and CAPA — findings flow to corrective actions with owners and closing evidence (blurred preview)

Audits & CAPA — findings to closed corrective actions

Evidence Binder — the audit-ready Word and Excel export with a clause-by-clause matrix (blurred preview)

Evidence Binder — one-click Word + Excel audit export

Baseline snapshot — capture a baseline and diff against it to see drift and regressions (blurred preview)

Baseline — capture a snapshot and diff to see drift

Offline AI assistant — editable drafts for policy, CAPA and analysis with no data egress (blurred preview)

Offline AI assistant — editable drafts, no data egress

Who it's for

Built for the whole supply chain

  • Tier-1 / Tier-2 / Tier-3 automotive suppliers that must operate and evidence a CSMS for OEM programmes.
  • Smaller & emerging OEMs that need UN R155 / ISO 21434 organisational readiness without an enterprise GRC spend.
  • Cybersecurity managers, GRC / compliance and quality teams who want the structure enforced and the binder generated — not hand-assembled.
  • Teams on air-gapped / restricted networks (defence-adjacent, IP-sensitive) that cannot use cloud tools.
  • Off-highway & agricultural machinery makers working to ISO/DIS 24882.

Why Munimentx

How it compares

Feature comparison with alternative approaches
Capability Cloud GRC / vSOC Spreadsheets / shared drives Consultants Munimentx
21434 §5 / R155 CSMS model built-in✓✗n/a✓
Multi-framework (R156 / CRA / ISO 24882)partial✗depends✓
Live readiness % + gap analysis✓✗✗✓
Runs fully offline / air-gap✗✓n/a✓
Your data stays on your machine✗✓✗✓
One-click auditor-ready binder✓✗✓✓
Affordable per-seat✗✓✗✓
Knowledge / living system stays in-housepartial✓✗✓

The offline, affordable CSMS workbench that helps automotive teams get ISO/SAE 21434 §5 + UN R155 audit-ready on their own machines — the governance, the evidence and the binder, without the cloud or the consultant.

Trust & security

Private by default — buyers will ask

100% offline

No account, no server, no online activation. The only ever-optional network call is a one-time AI-model download you can do on a separate machine and copy across.

Hardened & sandboxed

The renderer is locked down (connect-src 'none'), sandboxed, and asar-packaged with Electron fuses — defence in depth around your data.

Zero telemetry

We collect nothing. Your CSMS is yours.

Your IP stays yours

Everything lives in a local project file you control; nothing is uploaded, ever.

Honest evidence

The binder lists approved work products and the complete operational log, and states completeness against the standards — it never claims to certify compliance.

Licensing that respects you (roadmap)

Per-seat / node-locked, with a graceful read-only fallback when a licence lapses — you can always open and export your existing work; never locked out of your own data.

Where this goes

Local, affordable, method-complete — private by default

Horizon 1 · now → next

Becoming the definitive offline CSMS workbench

Deepen the 21434 §5 / R155 core: richer framework packs and clause guidance, smarter Headstart libraries per industry, a stronger evidence binder, and an AI assistant that genuinely saves hours on policy, CAPA and analysis drafting.

Horizon 2

The two-tool suite (with TARAexl)

TARAexl proves the product; Munimentx proves the organisation. A shared on-disk AI model and consistent, auditor-ready binders make the pair the offline, affordable alternative to enterprise cloud GRC platforms.

Explore TARAexl →

Horizon 3

The lifecycle, end to end, on your terms

A future on-premises multi-user edition (still 100% offline, on your own LAN) with segregation of duties and no data migration, broader multi-framework coverage (ASPICE-for-Cybersecurity, ISO 27001) — your data never leaves your control.

Horizons 2–3 describe our roadmap and may evolve. What we'll deliberately never build: cloud monitoring / vSOC / telemetry ingestion, a SaaS collaboration portal, or anything that requires your governance data to leave your machine.

Questions

Frequently asked about Munimentx

Does Munimentx run fully offline?

Yes. It is a self-contained single-user Windows application that runs 100% offline and stores everything locally in a project file you own — no cloud platform, no telemetry, no subscription. It is designed for air-gapped and restricted networks.

What is a CSMS, and who needs one?

A Cybersecurity Management System is the organisational side of automotive cybersecurity: policy, roles, managed processes, risk and supplier oversight, monitoring, incident handling, and a complete traceable evidence trail. UN R155 and ISO/SAE 21434 Clause 5 require a working CSMS — and require you to evidence it on demand.

Which frameworks does Munimentx cover?

UN R155 and ISO/SAE 21434 Clause 5 as the core model, with mapping for UN R156, the EU Cyber Resilience Act and ISO/DIS 24882. Munimentx supports your CSMS work; audit and certification outcomes remain the responsibility of your auditors and approval authorities.

How is Munimentx different from a cloud GRC platform?

Cloud GRC and vSOC platforms are capable, but they are priced for large OEMs and they hold your governance data and IP in someone else's cloud. Munimentx is built for Tier-N suppliers, smaller OEMs and teams on air-gapped networks who must produce the same audit-ready evidence without sending it anywhere.

What does Munimentx produce for an audit?

A one-click Evidence Binder exported to Word and Excel — approved registers, full logs and a clause-by-clause compliance matrix. Evidence files are copied into a local project vault, SHA-256 hashed and re-verified on load, so each item stays verifiable.

Is Munimentx available now?

Munimentx is in early access, so the capabilities described on this page may evolve before general availability. Request early access and we'll walk you through what is ready today.

Stand up and evidence your CSMS — on your own machine.

Request early access or book a 20-minute walkthrough — and see a complete ISO/SAE 21434 §5 + UN R155 CSMS stood up offline, with a one-click audit binder at the end.

Munimentx supports your CSMS work. Audit and certification outcomes remain the responsibility of your auditors and approval authorities.